EXXARO Central Workshop Optimisation

Delta Built Environment Consultants (Delta BEC) was appointed to conduct an optimisation study for the Pool Workshop Facility at the Grootegeluk Complex, which is responsible for the repair and maintenance of the mine’s fleet, excluding heavy-duty vehicles.